English Georgian

Mtkvari HPP Project

 
Upper part of construction site
Lower part of construction site
Headrace tunnel
Headrace tunnel
Tunnel Boring Machine at Herrenknecht workshop
Tunnel Boring Machine at Herrenknecht workshop
Lining segment factory construction works
Lining segment factory
Lining segment moulds
President M. Sakashvili and Minster of Energy A. Khetaguri visiting Mtkvari HPP
Tunnel adit drilling works
Tunnel adit
Dosco Roadheader drilling machine
Headrace tunnel and tunnet adit junction
Akhatsikhe Substation for Georgia-Turkey transmission line (2.5 km from Mtkvari HPP)
Diversion canal
Diversion canal
Surge shaft
Surge shaft
Bridge - lower part of construction site
Temporary bridge
Concrete factory - upper part of construction site
Concrete factory - lower part of construction site
Warehouses
Administrative building
NRGY (in GEL) 0.8500

 
Copyright © 2008. Caucasus Energy & Infrastructure.